First Industrial – First Park 94

Location Somers, WI
Size 1,200,000 Sq. Ft
Owner First Industrial Realty Trust
Architect Partners in Design Architects

Riley built two 600,000 SF industrial warehouses and completed all owner-direct sitework and infrastructure for this 309-acre development.

Both buildings feature 36’ clear height, with truck and drive-in docks. The project’s schedule was expedited and extremely fast-paced, which required the pre-ordering of the precast concrete wall panels.

The entire exterior pavement, parking, and roadway areas are cast-in-place concrete. The project included design-build for fire protection, plumbing, mechanical, and electrical systems, and Riley self-performed 3% of the trades.