Cancer Treatment Centers of America™ Central Plant Expansion

Zion, Illinois

Riley Construction is currently under construction for a major expansion to Cancer Treatment Centers of America™ Chicago area location. Since our relationship began in 1997, we have provided Construction Management at Risk delivery service for all the construction phases Riley has been involved at CTCA. Projects feature: major upgrades to the central plant and utilities to accommodate a 168,000 SF, 6-story Patient Tower; 943-cars, 307,000 SF, 5-story parking structure; 2-story vertical addition of the existing Surgery Center; and 3-story vertical addition of the existing Medical Office building.

The central plant expansion and modifications include:

  • (4) 4,000,000 btuh input natural gas fired hot water boilers
  • (3) 805 Ton Water Cooling Towers
  • (3) 805 Ton Chillers
  • (3) 1,374gpm Chilled Water Pumps
  • (3) 1,610gpm Condenser Water Pumps
  • (4) 372gpm Heating Water Pumps
  • Reuse of existing 1,250kw Diesel Generator to feed a 2,000A Emergency Distribution Switchboard
  • (3) 1,000kw Generators
  • 2500 kVA Substation