Ascension All Saints Cardiovascular Institute

Racine, Wisconsin

Riley Construction provided construction management services for the Ascension All Saints 212,000 SF Cardiovascular Institute.  The overall project included a full basement and six floors above grade with a rooftop heliport, and was completed in two phases.

Phase 1 included the full build-out of the first floor, which featured a new emergency care center with 10 observation rooms, 10 fast-track rooms and 14 acute care rooms.  The shell of the structure was constructed for the full six stories in preparation for Phase 2.

Phase 2 involved the full build-out of the catheterization lab and remaining five stories.  The five-story build-out provides cardiac and pulmonary physician offices for seven cardiologists and 11 heart, lung and cardiovascular specialists.  It also includes operating rooms with diagnostic equipment and 38 patient rooms specifically dedicated to cardiac patients.  The sixth floor included the build-out of the executive offices for the Ascension medical group including conference rooms, a reception area and offices.

FACTS

  • Size: 212,000 SF
  • Architect: Plunkett Raysich Architects